Tuesday, April 15, 2014

The Second Crossing

We have now made the second crossing, between the main line and the new central section, although this has still to be wired to the bus.
With space at a premium here, not helped by our desire to include a ballast depot, it has been tight getting the track from the station to the point where it must cross the new 'bridge'.
I think we have finally cracked it, by using Radius 2 curves and some flexi-track.
Hopefully, during the Easter break, we should get the track fixed down and wired to the bus - and, hopefully, we might even run a short test train.
It will be interesting to see how this area develops during the coming months and I will, of course, report on our progress throughout.

No comments:

Post a Comment